The workers took less than 4 hours to overlay my tiles with the pebblewash mix. The mix is nothing but pebbles and epoxy glue. There is acutally 3 layers, the first layer is plastic tiles, follow by a layer of netting, the 3rd layer is the pebble-mix. These 3 layers adds 3cm to the floor of the bathroom. After the work is completed, the epoxy glue has to be left to dry for 6 hours before the bathroom and toilet can be used.
Sunday, December 27, 2009
Constructing the resort-like feel of Pebblewash floor
I got the idea to create a more presentable look of my bathroom. I don't want to spend a bomb to hack away my existing tiles and re-lay with new ones. The hacking will also create a big mess and I would not be able to use the bathroom for 2 or 3 days. I chanced upon the idea of using pebbles that is laid over the existing floor tiles. Apparently, it is a more cost-effective way to create a new flooring. It will also give a more resort-like to the bathroom. The photos below show how the workers construct the new pebblewash floor for my bathroom and toilet.
.JPG)
.JPG)
.JPG)
.JPG)
.JPG)

The workers took less than 4 hours to overlay my tiles with the pebblewash mix. The mix is nothing but pebbles and epoxy glue. There is acutally 3 layers, the first layer is plastic tiles, follow by a layer of netting, the 3rd layer is the pebble-mix. These 3 layers adds 3cm to the floor of the bathroom. After the work is completed, the epoxy glue has to be left to dry for 6 hours before the bathroom and toilet can be used.
The workers took less than 4 hours to overlay my tiles with the pebblewash mix. The mix is nothing but pebbles and epoxy glue. There is acutally 3 layers, the first layer is plastic tiles, follow by a layer of netting, the 3rd layer is the pebble-mix. These 3 layers adds 3cm to the floor of the bathroom. After the work is completed, the epoxy glue has to be left to dry for 6 hours before the bathroom and toilet can be used.